Dry well southeast of the Knarr field in the North Sea – 35/4-3

deapsea-nordkapp-odfjelldrilling.jpg

The well was drilled by the Deepsea Nordkapp drilling facility. Photo: Odfjell Drilling.

12/05/2022 Aker BP ASA, operator of production licence 685, has concluded the drilling of wildcat well 35/4-3.

The well was drilled about 20 kilometres southeast of the Knarr field in the North Sea, and 100 kilometres west of Florø.

The objective of the well was to prove petroleum in Early Jurassic rocks in the Cook Formation.

The well encountered the Cook Formation, around 93 metres thick, of which 67 metres was sandstone with moderate to good reservoir quality. The well is dry.

Data acquisition has been carried out.

This is the first exploration well in production licence 685, which was awarded in APA 2012.

Well 35/4-3 was drilled to a vertical depth of 4674 metres below sea level and it was terminated in the Cook Formation from the Early Jurassic.

Water depth at the site is 399 metres. The well will be permanently plugged and abandoned.

The well was drilled by the Deepsea Nordkapp drilling facility, which will now drill wildcat well 6507/2-6 in production licence 261 in the Norwegian Sea, where Aker BP ASA is the operator.

Map showing the location of well 35/4-3

Updated: 12/05/2022

Latest news

Dry well in the Norwegian Sea (6507/2-8)
27/03/2025 Aker BP ASA and its partners have completed drilling on the “Kongeørn” prospect in the Norwegian Sea, 240 kilometres west of Sandnessjøen.
Drilling permit for wellbore 25/11-30 S
27/03/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 25/11-30 S in production licence 169, cf. Section 13 of the Resource Management Regulations.
Dry well in the North Sea (35/6-6)
26/03/2025 OMV and its partners have drilled a dry well on the “Horatio” prospect in the North Sea.
Production figures Febuary 2025
20/03/2025 Preliminary production figures for February 2025 show an average daily production of 1 938 000 barrels of oil, NGL and condensate.
Drilling permit for wellbore 9/6-1
18/03/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 9/6-1 in production licence EXL006, cf. Section 13 of the Resource Management Regulations.
Drilling permit for wellbore 6405/7-4
17/03/2025 The Norwegian Offshore Directorate has granted Aker BP ASA drilling permit for wellbore 6405/7-4 in production licence 1005, cf. Section 13 of the Resource Management Regulations.
Drilling permit for the wells 34/6-8 S and 34/6-8 A
11/03/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for the wells 34/6-8 S and 34/6-8 A in production licence 554, cf. Section 13 of the Resource Management Regulations.
Announcement of acreage for CO2 storage on the Norwegian Continental Shelf
05/03/2025 On 5th of March 2025, the Ministry of Energy announced one area for CO2 storage pursuant to the CO2 Storage Regulations. This area comprises defined blocks in the North Sea.
Gas/condensate discovery in the Norwegian Sea (6406/6-7 S)
05/03/2025 Equinor and its partners have proven gas/condensate in the “Mistral Sør” prospect.
Dry well in the North Sea (7/1-4 S)
04/03/2025 Vår Energi and its partners have drilled a dry well on the “Kokopelli” prospect, south of the Sleipner area.