The Guidelines to the annual status report for fields in production have been updated

06/09/2019 The Guidelines to the annual status report (ASR) have been updated, to ASR2019. The Guidelines are unchanged from last year’s Guidelines (ASR2018), with the exception of Chapter 3.2, “Reserves and resources – status”.

There, the requirements for reporting oil-in-place are reduced. Table 3.1 in Chapter 3.2 has also been edited to some extent. Potential deviations in relation to reporting to the revised national budget – RNB – must be addressed.

While there are few changes, we ask that the operators use the most recent version (ASR 2019) for their reporting. The deadline is 1 November.

The most recent Long Range Plan (LRP), which shall be prepared pursuant to the Joint Operating Agreement, shall be enclosed.

The submission must be in text format, such as Word, not PDF. Moreover, nothing in the Guidelines shall be deleted before they are submitted to the NPD, see the conclusion to the Introduction in the Guidelines. If the reporting is provided in the wrong format, the NPD may request a new ASR submission.

New Guidelines in pdf format and in Word format.

 

Updated: 28/06/2024

Latest news

Improved NCS map
21/02/2025 The Norwegian Offshore Directorate’s FactMaps have been upgraded, making it easier to use the service.
Dry well in the Norwegian Sea (6306/6-3 S)
21/02/2025 Aker BP ASA and its partners have drilled a dry well in the “Bounty Updip” prospect in the Norwegian Sea.
Minor increase in oil and gas resources on the NCS
20/02/2025 Total petroleum resources on the Norwegian continental shelf (NCS) saw a minor increase last year, according to last year’s "inventory" – the Resource Accounts for 2024.
Production figures January 2025
20/02/2025 Preliminary production figures for January 2025 show an average daily production of 1 990 000 barrels of oil, NGL and condensate.
Drilling permit for wellbore 7220/7-CD-1 H
10/02/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7220/7-CD-1 H in production licence 532, cf. Section 13 of the Resource Management Regulations.
CO2 storage on the Norwegian shelf could become a new industry
07/02/2025 Last year, more licences were granted for storing CO2 on the Norwegian continental shelf than ever before.
Dry well in the North Sea (35/6-5 S)
06/02/2025 Aker BP ASA and its partners have drilled a dry well in the “Njargasas” prospect in the North Sea.
Consultation – proposed new Regulation on data collection and documentation for mineral activities on the continental shelf
05/02/2025 The Norwegian Offshore Directorate (NOD) is presenting proposed new Regulation on data collection and documentation for mineral activities on the continental shelf.
Drilling permit for wellbore 7/1-4 S
31/01/2025 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore 7/1-4 S in production licence 1090, cf. Section 13 of the Resource Management Regulations.
Dry well in the Norwegian Sea (6305/10-1)
22/01/2025 Orlen Upstream Norway and its partner Norske Shell have drilled a dry well, wildcat well 6305/10-1 “Tomcat”, in the southern part of the Norwegian Sea.