The Guidelines to the annual status report for fields in production have been updated

06/09/2019 The Guidelines to the annual status report (ASR) have been updated, to ASR2019. The Guidelines are unchanged from last year’s Guidelines (ASR2018), with the exception of Chapter 3.2, “Reserves and resources – status”.

There, the requirements for reporting oil-in-place are reduced. Table 3.1 in Chapter 3.2 has also been edited to some extent. Potential deviations in relation to reporting to the revised national budget – RNB – must be addressed.

While there are few changes, we ask that the operators use the most recent version (ASR 2019) for their reporting. The deadline is 1 November.

The most recent Long Range Plan (LRP), which shall be prepared pursuant to the Joint Operating Agreement, shall be enclosed.

The submission must be in text format, such as Word, not PDF. Moreover, nothing in the Guidelines shall be deleted before they are submitted to the NPD, see the conclusion to the Introduction in the Guidelines. If the reporting is provided in the wrong format, the NPD may request a new ASR submission.

New Guidelines in pdf format and in Word format.

 

Updated: 28/06/2024

Latest news

Production figures December 2024
21/01/2025 Preliminary production figures for December 2024 show an average daily production of 2 017 000 barrels of oil, NGL and condensate.
Drilling permit for wellbore 35/6-6
21/01/2025 The Norwegian Offshore Directorate has granted OMV (Norge) AS drilling permit for wellbore 35/6-6 in production licence 1109, cf. Section 13 of the Resource Management Regulations.
Gas discovery in the Barents Sea (7122/9-2)
17/01/2025 Vår Energi ASA and its partners found gas in the “Elgol” prospect; however, preliminary estimates indicate that the discovery is not profitable given current price assumptions.
20 companies offered ownership interests
14/01/2025 In the 2024 awards in pre-defined areas (APA), 20 companies have been offered ownership interests in a total of 53 production licences on the Norwegian continental shelf (NCS).
Dry well in the North Sea (24/12-8 S)
14/01/2025 Aker BP and its partner Concedo drilled the dry well 24/12-8 S near the Bøyla field in the North Sea.
Record-high gas production in 2024
09/01/2025 The Norwegian Offshore Directorate's summary of activity on the Norwegian continental shelf in 2024 shows that gas production is higher than ever.
Drilling permit for wellbore 35/10-15 S
08/01/2025 The Norwegian Offshore Directorate has granted DNO Norge AS drilling permit for wellbore 35/10-15 S in production licence 1182 S, cf. Section 13 of the Resource Management Regulations.
Drilling permit for wellbore 6507/2-8
08/01/2025 The Norwegian Offshore Directorate has granted Aker BP ASA drilling permit for wellbore 6507/2-8 in production licence 942, cf. Section 13 of the Resource Management Regulations.
Dry wells in the North Sea (35/10-14 S and A)
23/12/2024 Equinor and its partners have drilled two dry wells (“Kvernbit/Mimung”) in the North Sea.
Drilling permit for wellbore 7/1-3
23/12/2024 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore7/1-3 in production licence 1090, cf. Section 13 of the Resource Management Regulations.